FUNCTION POINTER
In this tutorial we are going to see function pointer.
A function pointer is used to points the starting point of a function.
The function pointer must have same type of arguments as original function.
CODE
void fun();
void (*ptr[0])();
void setup() {
Serial.begin(9600);
}
void loop() {
ptr[0]=fun;
ptr[0]();
delay(700);
}
void fun()
{
Serial.println("EMBSYSTRONIX.BLOGSPOT.COM");
void (*ptr[0])();
void setup() {
Serial.begin(9600);
}
void loop() {
ptr[0]=fun;
ptr[0]();
delay(700);
}
void fun()
{
Serial.println("EMBSYSTRONIX.BLOGSPOT.COM");
Serial.println();
}
}
CODE EXPLANATION
In the above code, a function void fun() is created
An array of pointer function is created
void (*ptr[0])();
void setup()
In void setup function serial communication is enabled with baud rate of 9600 bits per second.
void loop()
In void loop function., the ptr[0] index stores the begining addess of a function fun;
then the pointer ptr[0](); is called and it calls the fun() and it prints
"EMBSYSTRONIX.BLOGSPOT.COM" repeatedly for 700 ms time delay.

Comments
Post a Comment